Pronóstico de demanda y política de inventarioDemand forecasting and inventory policy

¿Cuánto vamos a vender de cada producto en las próximas cuatro semanas, y cuánto inventario hace falta para cumplir un 95 % de nivel de servicio sin sobre-stock?

How much of each product will we sell over the next four weeks, and how much inventory do we need to hit a 95% service level without overstocking?

Respuesta cortaShort answer

Con un fill rate de 95 % y 7 días de lead time, la política basada en el modelo necesita 14 % menos inventario promedio que una política clásica de media móvil: USD 63.7 mil contra 73.8 mil.

At a 95% fill rate and a 7-day lead time, the model-based policy needs 14% less average inventory than a classic moving-average policy: USD 63.7k versus 73.8k.

Métrica de éxitoSuccess metric ResultadoResult
El modelo supera a SeasonalNaive en WRMSSE (3 ventanas)The model beats SeasonalNaive on WRMSSE (3 windows)0.528 vs 0.785 (−33 %)
Contra el mejor baseline, AutoETSAgainst the best baseline, AutoETS0.528 vs 0.608 (−13 %)
Fill rate en productos clase A (meta ≥ 95 %)Fill rate on class A products (target ≥ 95%)96.8 %
Inventario a igual servicio frente a la política clásicaInventory at equal service versus the classic policy−14 % · A −11 % · B −25 %
Reproducible con make allReproducible with make allSí, CI corre el pipeline completoYes, CI runs the full pipeline

    Figura 1. Inventario promedio necesario para cada fill rate con 7 días de lead time. Como cada política termina con un nivel de servicio distinto, la comparación justa es a lo largo de la curva y no en un solo punto. Figure 1. Average inventory needed for each fill rate with a 7-day lead time. Each policy ends at a different service level, so the fair comparison runs along the curve, not at a single point. Fuente: simulación diaria contra 12 semanas de demanda real fuera de muestra. Source: daily simulation against 12 weeks of real out-of-sample demand.

    Lo que encontréWhat I found

    1. El modelo gana donde hay volumen y pierde en la cola. Mejora el WAPE en los segmentos AX y AY (74 % del ingreso) y empeora hasta 16 % en CZ, donde una media móvil funciona mejor. La recomendación no es usar ML para todo, sino segmentar.
    2. El ahorro de inventario crece con el lead time: −7 % con 3 días, −14 % con 7 y −22 % con 14. Con un fill rate de 90 % la diferencia baja a 2–4 %.
    3. El factor z no entrega lo que promete. Con el factor de seguridad para 95 %, el nivel de servicio de ciclo logrado fue 90 %, y 82 % con la política clásica. Fill rate y servicio de ciclo son métricas distintas y conviene reportar ambas.
    4. Sofisticar el safety stock no lo hizo más eficiente. Calcularlo con σ del error acumulado o con cuantiles empíricos mejoró la calibración, pero el inventario fue el mismo para el mismo servicio. Lo que mueve la curva es el pronóstico.
    5. Los intervalos de predicción quedan cortos: 74 % de cobertura real para el intervalo de 80 % y 89 % para el de 95 %. No cumple la meta de ±5 puntos que me fijé.
    6. Una variable "obvia" empeoraba el modelo. Usar item_id como categórica (1,429 niveles) subía el WRMSSE 5.6 % en las ventanas de calibración, así que quedó fuera.
    1. The model wins where there is volume and loses in the tail. It improves WAPE in the AX and AY segments (74% of revenue) and gets up to 16% worse in CZ, where a moving average does better. The recommendation is not ML for everything but segmentation.
    2. Inventory savings grow with lead time: −7% at 3 days, −14% at 7 and −22% at 14. At a 90% fill rate the gap shrinks to 2–4%.
    3. The z factor doesn't deliver what it promises. With the safety factor for 95%, the achieved cycle service level was 90%, and 82% for the classic policy. Fill rate and cycle service are different metrics and both should be reported.
    4. A fancier safety stock was not more efficient. Using σ of the cumulative error or empirical error quantiles improved calibration, but needed the same inventory for the same service. What moves the curve is the forecast.
    5. Prediction intervals come up short: 74% real coverage for the 80% interval and 89% for the 95% one. That misses the ±5-point target I set.
    6. An "obvious" feature made the model worse. Using item_id as a categorical (1,429 levels) raised WRMSSE by 5.6% in the calibration windows, so it was dropped.
    Figura 2. Reducción de inventario frente a la política clásica, con 95 % de fill rate, según el lead time. Figure 2. Inventory reduction versus the classic policy, at a 95% fill rate, by lead time.

    Cómo lo construíHow I built it

    1. DatosVentas, precios y calendario de M5 en formato largo, en DuckDB.
    2. DataM5 sales, prices and calendar in long format, in DuckDB.
    3. SegmentaciónClases ABC/XYZ y patrón de demanda por producto.
    4. SegmentationABC/XYZ classes and demand pattern per product.
    5. BaselinesNaive, SeasonalNaive, media móvil, AutoETS y AutoARIMA.
    6. BaselinesNaive, SeasonalNaive, moving average, AutoETS and AutoARIMA.
    7. ModeloLightGBM global con objetivo Tweedie, rezagos, medias móviles, eventos y precio relativo.
    8. ModelGlobal LightGBM with a Tweedie objective, lags, rolling means, events and relative price.
    9. Política(s, S) con revisión diaria: safety stock, punto de reorden y lote EOQ.
    10. Policy(s, S) with daily review: safety stock, reorder point and EOQ lot size.
    11. SimulaciónCada política, día a día, contra la demanda real.
    12. SimulationEach policy, day by day, against real demand.

    De las seis ventanas de 28 días, las tres primeras sirvieron para calibrar: ahí elegí las variables y estimé la incertidumbre del pronóstico. Solo reporto las tres últimas, para no tomar ninguna decisión mirando el periodo evaluado.

    Of the six 28-day windows, the first three were used for calibration: that's where I chose the features and estimated forecast uncertainty. I only report the last three, so no decision was made by looking at the evaluated period.

    Página de resumen del dashboard de inventario, con el inventario necesario para el 95 % de servicio y la curva servicio–inventario
    Figura 3. El dashboard tiene cinco páginas: resumen, pronóstico, inventario, producto y portafolio. Es un solo HTML sin servidor que GitHub Actions publica con cada cambio. Figure 3. The dashboard has five pages: summary, forecast, inventory, product and portfolio. It is a single serverless HTML file that GitHub Actions republishes on every change.

    Lo que no se puede afirmarWhat this can't claim

    • Los datos son de una tienda de Walmart en California, no de un retailer mexicano. El método se transfiere, pero las cifras no.
    • Los intervalos de predicción tienen menos cobertura de la nominal, así que el safety stock basado en ellos queda corto en algunos productos.
    • En los productos de baja rotación (CZ) el modelo es peor que una media móvil.
    • Las reglas de M5 no permiten redistribuir los datos: el dashboard publica solo resultados derivados, y el código falla si aparece una venta diaria o un precio.
    • The data comes from one Walmart store in California, not a Mexican retailer. The method transfers; the numbers don't.
    • Prediction intervals under-cover their nominal level, so safety stock based on them falls short for some products.
    • For slow movers (CZ) the model is worse than a moving average.
    • M5 rules forbid redistributing the data: the dashboard publishes only derived results, and the code fails if a daily sale or price ever shows up.